S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
277. The authorization holder must, within 6 months after the granting of the authorization by the Minister, complete the temporary closure work.
O.C. 1252-2018, s. 277.
In force: 2018-09-20
277. The authorization holder must, within 6 months after the granting of the authorization by the Minister, complete the temporary closure work.
O.C. 1252-2018, s. 277.